In some ways NJDOT is a leader in bicycle and pedestrian and Safe routes to School facilitation but in too many others ways its the same old 1960's NJDOT. Recently NJDOT announce that it will be repairing two bridges in Somerset County which happens to have some of the best road cycling in the state. Unfortunately NJDOT failed to recognize cyclists needs in their closure plans.
In Franklin Township it will be replacing and rehabilitating the bridge that goes over the Delaware and Raritan Canal on the Weston (Manville) Causeway near Manville. According to the press release, the bridge will be closed until early summer. The press release then goes into significant detail about detours for motor vehicles. However this bridge is directly adjacent to the Canal Towpath which is a very popular bicycle route and part of the East Coast Greenway. There is also a parking lot on east side of the canal which serves the Tow Path on the west side (not seen in the Google image below). The bridge to be closed is the only access from the parking lot to the path. While it may be inevitable that the bridge will need to be closed to all forms of traffic, there are no details given about how this project might effect or even close the Tow Path. There is no information if pedestrian and cycling access might be maintained over the bridge during the project, and if not, a detour for bicyclist and pedestrians that might be not be so effected by detoured motor traffic.
While cyclists familiar with this area should be able to navigate around the Weston Causeway closure with only little problem, further north in Bedminster, the closure of Burnt Mills Road as bridges are rebuilt over both I287 and I78 will cause significant inconvenience for cyclists. This area is exceptionally popular with cyclists as riders will come down from Washington Valley Drive and connect to Burnt Mills Road and the fantastic cycling roads to the west. The bridge replacement project will last until the end of 2014. In the NJDOT press release, detours are given for but use I78 and I287. It is rather disappointing that the detours given by NJDOT are simply not an option for cyclists and that the press release mentions noting about bicyclist or pedestrian needs. Fortunately WalkBikeJersey has you covered with the bicycle friendly detour provided below.
We all understand that these bridges need to be repaired and that closure to all traffic; motor, bike and pedestrian is likely the only way to safely get the work done. However, failure to address the needs of cyclists regarding these road closures by NJDOT in areas that is exceptionally popular with cyclists is just not acceptable today.
Showing posts with label Delaware and Raritan Canal Towpath. Show all posts
Showing posts with label Delaware and Raritan Canal Towpath. Show all posts
Friday, March 14, 2014
Friday, July 26, 2013
Putting the Capital to Coast Trail on the Map
Since 2000 Fred Lockenmeyer has pursued his dream of connecting the Delaware and Raritan Canal in Trenton with the Edgar Felix Bike Path in Manasquan by forging a trail through the rural/suburban swath of Southern Mercer and Monmouth Counties. A trail located in the geographic center of the state that will be known as the Capital to Coast Trail.

Wednesday, January 30, 2013
D&R Canal Towpath / East Coast Greenway closed in Franklin Township
Driving past the Amwell Road trailhead of the Delaware and Raritan Canal Towpath two weeks ago I saw something rather unusual. There was a six foot tall fence blocking off the entire trailhead parking lot, including access to the trail itself. Today as I was out riding my road bike, I purposely pedaled past the trailhead to get a closer look. There was a sign on the fence indicating the following:
View D&R Towpath / East Coast Greenway Closure in a larger map
Above is a map of the trail closure and one potential detour. Be aware that the traffic volume on Amwell Road can be rather high and there is no shoulder. Also the crossing at Manville / Weston Causeway can be tricky and extra caution should be taken. Millstown River road is also a possibility detour but the traffic can be high in this road as well.
Noting the above hazards, its a shame that the trail had to be closed for this entire stretch. The spillway being reconstructed (red point) is north of the Colonial Park Bridge (green point). It would have been nice to keep the trail open to the Colonial Park Bridge as a detour through the park (green line) would have eliminated the most hazardous Amwell Road leg. However when I was there, the Amwell Road trailhead was being used as a staging area for the contractors and heavy equipment was being driven on the towpath. Still, it would be nice to at least keep the part of the trail open when construction is not being done, like on weekends.
Another note of importance found on the Delaware and Raritan Canal Commission website was this:
View Larger Map
As many of you know, the elegant suspension footbridge over the Delaware connecting Bulls Island and Lumberville PA is an important connection for many cyclists. The next closest bridges at Stockton and Frenchtown are miles away. I crossed the bridge just 11 days ago and no notices were posted of the pending two month closure as of yet.
The towpath from AMWELL ROAD (RT 514) TO THE WESTON CAUSEWAY will be CLOSED FROM JANUARY 21 THROUGH JUNE 30 due to repair work on the spillway. Also note there will be NO ACCESS TO/FROM COLONIAL PARK VIA THE PEDESTRIAN BRIDGE. Please plan your routes accordingly.
View D&R Towpath / East Coast Greenway Closure in a larger map
Above is a map of the trail closure and one potential detour. Be aware that the traffic volume on Amwell Road can be rather high and there is no shoulder. Also the crossing at Manville / Weston Causeway can be tricky and extra caution should be taken. Millstown River road is also a possibility detour but the traffic can be high in this road as well.
Noting the above hazards, its a shame that the trail had to be closed for this entire stretch. The spillway being reconstructed (red point) is north of the Colonial Park Bridge (green point). It would have been nice to keep the trail open to the Colonial Park Bridge as a detour through the park (green line) would have eliminated the most hazardous Amwell Road leg. However when I was there, the Amwell Road trailhead was being used as a staging area for the contractors and heavy equipment was being driven on the towpath. Still, it would be nice to at least keep the part of the trail open when construction is not being done, like on weekends.
Another note of importance found on the Delaware and Raritan Canal Commission website was this:
The Delaware River Joint Toll Bridge Commission will be conducting a renovation and rehabilitation to the pedestrian bridge located at Bulls Island Recreation Area Day Use Area. The foot bridge will be CLOSED to the public between SUNDAY, MARCH 3, 2013 TO FRIDAY, MAY 3, 2013. Please plan your routes accordingly.
View Larger Map
As many of you know, the elegant suspension footbridge over the Delaware connecting Bulls Island and Lumberville PA is an important connection for many cyclists. The next closest bridges at Stockton and Frenchtown are miles away. I crossed the bridge just 11 days ago and no notices were posted of the pending two month closure as of yet.
Sunday, April 01, 2012
Delaware & Raritan Canal Towpath repaired and resurfaced
The Delaware & Raritan Canal Towpath is in the process of being resurfaced to repair flood damage from Hurricane Irene back in September. Much of the work is likely to have already been completed but there could still be some rough spots particularly in the area south of South Bound Brook which saw some very bad damage. From the look of things that I saw, the towpath looked as good as it was just prior the Hurricane Irene and likely better.
However, it would appear that once again no binding agent was used to help cement the crushed red shale aggregate together from water caused erosion. A quick and low effort pawing at the surface with my shoe easily put a divot in the surface an inch deep. This calls into question whether the trail surface will just wash away again in the next flood just as I predicted the first time I reported the trail resurfacing nearly two years ago.
In other D&R news, there is a minor but well marked detour in South Bound Brook as some sort of major earth moving is being done between the canal path and the Raritan River near the Queens Bridge over the Raritan. Fortunately, when the factory site was redeveloped in S. Bound Brook a number of years ago, the old train bridge that went over the canal to access the old factory was saved and an access path was built to allow easy and convenient access to the canal from the local neighborhood (many locals could be seen accessing the towpath when I stopped for a quick look). This wise move years ago is now paying off as this access now provides a critical function allowing for a simple and safe detour and not one that would require trail users to ride on a dangerous section of Easton Ave near Interstate 287.
Oh yeah! Don't forget that the D&R Canal Towpath is a large and vital link of the East Coast Greenway here in New Jersey.
| The freshly resurfaced pathway at the Manville Causeway. |
However, it would appear that once again no binding agent was used to help cement the crushed red shale aggregate together from water caused erosion. A quick and low effort pawing at the surface with my shoe easily put a divot in the surface an inch deep. This calls into question whether the trail surface will just wash away again in the next flood just as I predicted the first time I reported the trail resurfacing nearly two years ago.
In other D&R news, there is a minor but well marked detour in South Bound Brook as some sort of major earth moving is being done between the canal path and the Raritan River near the Queens Bridge over the Raritan. Fortunately, when the factory site was redeveloped in S. Bound Brook a number of years ago, the old train bridge that went over the canal to access the old factory was saved and an access path was built to allow easy and convenient access to the canal from the local neighborhood (many locals could be seen accessing the towpath when I stopped for a quick look). This wise move years ago is now paying off as this access now provides a critical function allowing for a simple and safe detour and not one that would require trail users to ride on a dangerous section of Easton Ave near Interstate 287.
Oh yeah! Don't forget that the D&R Canal Towpath is a large and vital link of the East Coast Greenway here in New Jersey.
Tuesday, September 06, 2011
Delaware & Raritan Canal Towpath severely damaged
As part of my work with the East Coast Greenway Alliance I spent some of my time last week inspecting the flood damage wrought by Hurricane Irene here in the New Brunswick area. While the stretch that goes through Johnsons Park in Piscataway and Highland Park escaped relatively unscathed, the Delaware & Raritan Canal Towpath section just outside of New Brunswick suffered sever damage.
For much of its length the D&R Towpath lies in the flood plan of both the Raritan and Millstone Rivers leaving it highly susceptible to flood damage. Unfortunately with record setting rains and high winds from Irene, it is no surprise that the damage was really bad on the section between Landing Lane in New Brunswick to Easton Ave at South Bound Brook. This six mile section of the trail was barely passable last week. What normally takes me less than half an hour to ride took me over two hours due to numerous blow-downs and sever scouring and erosion of the once smooth trail surface. It's safe to say that this section of the Towpath and East Coast Greenway is closed for the foreseeable future.
For much of its length the D&R Towpath lies in the flood plan of both the Raritan and Millstone Rivers leaving it highly susceptible to flood damage. Unfortunately with record setting rains and high winds from Irene, it is no surprise that the damage was really bad on the section between Landing Lane in New Brunswick to Easton Ave at South Bound Brook. This six mile section of the trail was barely passable last week. What normally takes me less than half an hour to ride took me over two hours due to numerous blow-downs and sever scouring and erosion of the once smooth trail surface. It's safe to say that this section of the Towpath and East Coast Greenway is closed for the foreseeable future.
![]() |
| One of the more imposing blow-downs made more interesting by the poison ivy covering the blown down tree trunks. |
Subscribe to:
Posts (Atom)
